Job Title: Junior MRP Controller with Rail domain exp.
Location: Thunder Bay , Ontario Canada
Duration: 6+ Months
Primary Function
Under close supervision, schedule and monitor all activities of production and to ensure the full availability of parts at the work station within the established timeframes. Act as the main liaison between Production and Supply Management and assist Intermediate and Senior MRP Controllers as required.
Working Procedure
Assure manufactured or purchased parts are available at the appropriate work stations.
Analyze requirements and transaction to maintain an accurate coverage of parts.
Based on the master calendar for production, releases orders, shop orders and call of material to the warehouse with established manufacturing strategies.
Analyzes and issues schedules for sub-assemblies based on the master calendar (planning charts).
Maintain the material master parameters to assure inventory availability, optimization and total inventory cost reduction strategies.
Executes all transactions in order to provide and maintain accurate information in a timely fashion in SAP, including COGI.
Ensures that all emergency is escalated and followed up until resolution, including the monitoring of parts retained by Quality Assurance and their restoration into the production schedule.
Implement methods changes to production orders to incorporate the latest revision of technical documentation, parts applications, etc. and ensure they updated on shop floor at all times.
Determines the quantities of manufactured and purchased parts required in inventory, according to value, deadlines, space and shelf life with respect to budgetary objectives, analyses gaps between theoretical inventory and physically verified and manages obsolete inventory/surplus.
Maintain and implement the Plan for Every Part (PFEP) for their scope of work
Perform machine loading functions and analyze future production loads.
Provide BOS support.
Qualifications
Perform other related duties as required
College diploma in Industrial Engineering and/ or Bachelor degree in Operations Management or similar
The Following Would Be Considered An Asset
Intermediate skills in MS Excel
General knowledge Enterprise Resource Planning systems.
MRP knowledge
SAP knowledge